Saturday, February 26, 2011

How To Save Files On To Minimax

take tram extension to Golm form - First Variobahn in test mode

As the PNN in today's issue of to repay the company plans to extend the tram line on the Science Campus in Golm shape. After examining several variations of them favored the ViP a path that will reach from the current Endstadtion "Charlottenhof" parallel to the railway line the train station "Potsdam Park Sanssouci" and then later west of the road at the New Palace to the halls of residence out. Just before the Kaiser-Friedrich-Strasse, which was too narrow to accommodate the tram, the railway line would lead through the fields next to Golm. As the ViP announced that the planning was at an early stage, we expect but the fact that the line extension will be available later this year on the agenda of the City Council and could be built after 2015.

Meanwhile, there are also new information on the Vario tracks. The first car is now finished and is currently test drives take in Velten. If these go well, could reach the orbit in April Potsdam. A second will follow in the summer.
The manufacturer assured again, he do everything "to minimize the noise emission of the vehicle. In advance, there had been concerns about the noise in the car ( tram2000.blogspot reported ).

Addendum of 01/03/2011: The CNAC has shown the proposed line on a graph, which can be found here .

0 comments:

Post a Comment